Showing posts with label Lock Lane. Show all posts
Showing posts with label Lock Lane. Show all posts

Thursday, April 17, 2008

Lock Lane Cases Complete!

I put the finishing touches on the built-ins on Lock Lane this afternoon, installing knobs and touching up a few paint spots. This was a very enjoyable project from the design phase straight through to hanging doors. Having a great client who really appreciates one's work is always a pleasure!

I hope to have a more professional photo of the complete project to post sometime in the next month or so.

In the meantime, if you happen to own one of the Lock Lane condos with this particular floor plan, I saved all my drawings and templates...



Thursday, April 10, 2008

Installation Finis! Painting Starts Tomorrow.

Here is a roughly patched-together shot of the completed woodworking over on Lock Lane. Tomorrow I'll do last-minute finish prep, then prime everything. I'll mortise the door hinges and start making the shelves tomorrow as well. I expect I'll wrap up by Tuesday or Wednesday.